Projects

Runway 5-23 Rehabilitation and Airfield Improvements at Grand Strand Airport (CRE)

Runway 05-23 at the Grand Strand Airport (CRE) required a complete rehabilitation effort for the airport’s future development. The project involved a concrete overlay of Runway 05-23 and an overlay of Taxiway A, A1, A4 & A5. Additional work included pavement rehabilitation of a small portion of Taxiway A and A4 and new construction of

Runway 5-23 Rehabilitation and Airfield Improvements at Grand Strand Airport (CRE) Read More »

Hood Avenue Improvements

This project includes widening and realignment of a roadway corridor along existing Hood Avenue within the Fort Gillem Redevelopment area in Forest Park, Georgia. The design included Hood Avenue and a section of Flankers Road broken up into a 2- or 3-phase construction project. Aulick Engineering addressed the need to implement stormwater measures to minimize

Hood Avenue Improvements Read More »

Chemical Storage Facility Stormwater Flooding Analysis

Aulick Engineering performed a hydraulic analysis for a Global Specialized Chemical Storage Facility in Houston, Texas. Due to the harmful chemicals handled at the facility, the terminals have two separate stormwater systems. One system collects water and eventually discharges it into the adjacent Galveston Bay. The other system collects potentially contaminated water, routes it to

Chemical Storage Facility Stormwater Flooding Analysis Read More »

Emergency Bridge Replacement Package 2020-1, Design-Build

Aulick Engineering provided hydraulic and hydrological design services and the associated roadway and drainage work for two emergency design-build bridge replacement projects – S-174 over Six & Twenty Creek (Anderson County) and S-816 over Mud Creek (York County).  Aulick performed bridge hydraulic analysis, scour analysis, and erosion control services per SCDOT requirements. Due to the

Emergency Bridge Replacement Package 2020-1, Design-Build Read More »

State Bridge Road Widening and Pedestrian Bridge over Chattahoochee River

To increase vehicular capacity, the City of Johns Creek proposed widening State Bridge Road from west of the intersection at Parkway Baptist Church to the east side of the Chattahoochee River and construct a new pedestrian bridge over the river north of the existing bridges. The crossing is in a FEMA Zone AE; therefore, the

State Bridge Road Widening and Pedestrian Bridge over Chattahoochee River Read More »

Runway 18-36 Program at Ridgeland-Claude Dean Airport (3J1)

Aulick Engineering provided stormwater and erosion control design services as well as SC DHEC permitting for this new, 4,200-foot-long runway project. The design included the installation of 4,300 linear feet of drainage pipe and three large stormwater ponds. To allow for temporary sediment control during construction, the stormwater ponds were constructed early and designed for

Runway 18-36 Program at Ridgeland-Claude Dean Airport (3J1) Read More »

Commercial Terminal Apron Expansion at Valdosta Regional Airport (VLD)

Aulick Engineering provided full-time Resident Project Representative (RPR) and construction inspection services of the terminal apron expansion. The project involved storm drainage, apron entrance road grading, asphalt paving, apron grading, apron concrete paving, marking removable, re-marking, fencing, erosion control, and grassing. The RPR was responsible for coordination with airport operations and the air traffic control

Commercial Terminal Apron Expansion at Valdosta Regional Airport (VLD) Read More »